clement13.net
Original photo: A model airplane
Description
A model airplane
Source
That model plane guy · original page
Licence
CC0 Public domain
Original photo, unretouched. The background is a version of it stylised by the site.

Reference matrices

Six recognized frameworks to place an organization, and how to choose the right one.

Each matrix places the level of an organization in a specific domain. If the principle is new to you, start with Understanding maturity matrices.

Choosing a matrix by domain#

DomainMatrixScaleMy overall level
Data governanceDAMA-DMBOK0 – 5—
Enterprise analytics / BITDWI1 – 5—
BI platform adoptionMicrosoft Fabric / Power BI100 – 500—
Development securityOWASP SAMM0 – 3 per practice—
Testing / quality assuranceTMMi1 – 5—
Cloud cost controlFinOpsCrawl / Walk / Run—

The “My attainment level” button (at the top of the page) shows, in this table, the overall level I entered for each matrix.

The six matrices#