

- Description
- Vue plongeante sur un grand faisceau de voies et un atelier ferroviaire sous un ciel nuageux.
- Source
- Telecineguy · original page
- Licence
- CC0 Public domain
Overview of Version Control Systems
Understand what version control (VCS) is and why it is the backbone of any project, including data/BI.
In Brief
- Understand what version control (VCS) is and why it is the backbone of any project, including data/BI.
- Distinguish centralized and distributed, pessimistic locking and optimistic merging, snapshots and deltas.
- Place CVS, SVN, Perforce, Mercurial, Plastic SCM, Fossil, TFVC, and Git in history and in their current use cases.
- Know what a versioned object, a hash, a commit, and a branch are.
- Have a /5 rated decision framework to choose the tool based on context.
Level: 🟢→🟡
Why a VCS#
🟢 Beginner level
Without VCS, versioning is done by copying folders (rapport_v2_final_VRAI.pbix). That fails in four ways: you don't know who changed what, you can't compare two states, people overwrite each other, and you can't reconstruct what was delivered to a client two years ago. A VCS provides:
- History: every change is recorded with author, date, and message.
- Rollback: return to any past state.
- Parallel work: branches, merges.
- Traceability: link a change to a ticket, a build, a delivery (see CI/CD: Continuous Integration and Continuous Delivery).
- Audit: prove what was changed, by whom, before a given production deployment.
A client reports that a visit coverage metric has been wrong since the version delivered in March. With a VCS and release tags, in minutes you can find the exact delivered SQL script version, compare it with the current one (diff), and identify the faulty change. Without VCS, you rely on the team's memory.
Minimal vocabulary#
| Term | Meaning | TFVC equivalent |
|---|---|---|
| Repository | Database containing the full history | Collection / team project (server) |
| Working copy | The files on your disk | Workspace |
| Commit | Recording of a coherent set of changes | Changeset (check-in) |
| Branch | Parallel development line | Branch (versioned folder) |
| Merge | Bring two lines together | Merge |
| Tag | Fixed name on a state | Label |
| Shelving | Uncommitted saved work | Shelveset (Git: stash) |
| Conflict | Two incompatible changes to the same location | Conflict |
The terms are covered in the Glossary.
Centralized vs. distributed#
🟢 Beginner level
Centralized: a single server holds the history. The client machine has only the requested version plus metadata. You need the server for most operations (history, commit, branch). Examples: CVS, SVN, Perforce, TFVC.
Distributed: each machine holds the entire repository, including history. Commit is local; then you sync with one or more remote repositories (push, pull). Examples: Git, Mercurial, Fossil, Plastic SCM (distributed mode).
Centralized Distributed
[Server] [Repo A] <--> [Reference repo] <--> [Repo B]
/ | \ (full history everywhere)
Workstation Workstation Workstation
(copy) (copy) (copy)
| Criterion | Centralized | Distributed |
|---|---|---|
| Offline work | Limited (TFVC local workspaces: partial) | Complete |
| Atomic and frequent commits | Every commit is published | Local first, published later |
| Fine-grained path-based access control | Native (Perforce, TFVC) | At repository level, clumsy workarounds otherwise |
| Large repos / large binaries | Often better (you don't clone everything) | Costly without partial clone/LFS |
| Backup | One point to protect | Naturally replicated |
| Branches | Sometimes heavy (tree copy) | Trivial (a pointer) |
“Distributed” does not mean “without a reference server.” In a company, one remote repository is authoritative (GitHub, Azure Repos, GitLab). Symptom: a team that thinks git commit means “it's saved for everyone.” Cause: commit is local. Remedy: push + branch protection + server backup.
Locking vs. merging#
🟢 Beginner level
Two people modify the same file. Two philosophies:
- Pessimistic locking (lock-modify-unlock): you “reserve” the file; nobody else can edit it. Advantage: no conflict. Drawback: blocking, forgotten unlocks, impossible parallel work. Suitable for non-mergeable binary files (.pbix, .docx, images).
- Optimistic merging (copy-modify-merge): each person edits their own copy; on save, the tool merges and reports conflicts. Suitable for text files.
TFVC supports both: locking checkout (/lock:checkout) or non-locking (/lock:none), depending on workspace and project configuration. Git only supports merging; for binaries, Git LFS adds locking (git lfs lock) by repository convention. Perforce and SVN handle both.
A Power BI report saved as .pbix is a binary zip: two people cannot merge it. The PBIP project format (TMDL and text JSON folders) makes merging possible: see 06.
Snapshots vs. deltas#
🟡 Practical level
Two ways to store history:
- Deltas (CVS, SVN, TFVC, Perforce, many legacy systems): for each file, store the base version then successive differences. Compact for small changes, but reconstructing an old version requires replaying deltas; the notion of “repository version” is a global number (revision, changeset).
- Snapshots (Git): each commit points to a complete snapshot of the tree. Unchanged files are simply reused by reference (same object). Git then compresses into packfiles, computing deltas after the fact between nearby objects: the logical model is snapshot, physical storage is mixed.
The logical difference matters: in a snapshot model, comparing any two versions is direct; renaming is not recorded, it is inferred by content similarity (Git), whereas TFVC explicitly records the “rename” operation (hence its ability to track the history of a moved file, at the cost of rigidity).
Objects and hashing#
🟡 Practical level
A modern system handles few concepts: a content object (the file), a tree (the list of names and objects), a commit (the tree + parents + author + message). In Git, each object is identified by a hash of its content (historically SHA-1, optionally SHA-256). Consequences:
- Integrity: changing an object changes its identifier; any corruption is detectable.
- Deduplication: two identical files occupy only one object.
- Practically tamper-evident history: a commit's identifier depends on its parents; rewriting the past changes all subsequent identifiers.
- Non-sequential identifiers: no “revision 4217,” but
b9a971b. TFVC sequential numbers (changeset 45815) are more readable for humans and reports.
SHA-1 has academically demonstrated collisions; Git uses a hardened variant that detects them. The SHA-256 option exists but interoperability remains limited (status 2026-10: verify by hosting provider). Do not base a security requirement on hash alone: use commit/tag signing (see 02).
Tool history#
🟡 Practical level
| Period (orders of magnitude) | Generation | Tools | Dominant idea |
|---|---|---|---|
| 1970s-80s | Local, file by file | SCCS, RCS | Single-file history |
| 1990s | Client-server, project | CVS, PVCS, Visual SourceSafe | Shared repository, optimistic merge (CVS) or locking (VSS) |
| 2000s | Centralized “atomic” | Subversion (SVN), Perforce, TFS/TFVC (2005), ClearCase | Atomic commits, global revisions, branch-by-copy |
| Mid-2000s | Distributed | BitKeeper, Git, Mercurial, Bazaar, Darcs | Complete local repository, lightweight branches |
| 2010-2020 | Git dominance, platforms | GitHub, GitLab, Bitbucket, Azure Repos Git | Pull requests, integrated CI |
| 2020+ | Scale and monorepos | Git with partial clone, VFS/Scalar; Perforce in game studios | Large repositories, large binaries |
Reliable landmark: Git was created in 2005 by Linus Torvalds for the Linux kernel; TFVC originated with Team Foundation Server 2005, and Visual SourceSafe was its de facto predecessor at Microsoft. Microsoft later added Git to TFS (2013) and made Git the default choice.
Systems One by One#
🟡 Practical level
CVS — Ancestor. No atomic commits, no renaming, expensive branches. Migrate if encountered.
Subversion (SVN) — Centralized, atomic commits, global revisions, branches and tags via cheap copy (/trunk, /branches, /tags by convention). Path-based permissions. Still common in legacy environments. Good with large binaries, locking available.
Perforce Helix Core (renamed Perforce P4 in 2025) — Centralized, very high performance on huge repositories and binaries (video games, hardware). Workspaces, changelists, shelving, file locking, fine-grained path permissions. A Git mode (Helix4Git) exists for coexistence. Commercial license.
Mercurial — Distributed, more consistent interface than Git, but ecosystem greatly reduced (Bitbucket dropped Mercurial in 2020). Still used in some large organizations. Existing maintenance, declining adoption.
Plastic SCM (Unity Version Control) — Hybrid distributed/centralized, good with binaries and game art, polished GUI, task branches. Acquired by Unity, renamed Unity Version Control. Niche ecosystem.
Fossil — Distributed, single executable, includes ticketing, wiki, and forum in the repository (SQLite). Ideal for small standalone projects; little enterprise adoption.
TFVC (Team Foundation Version Control) — Centralized, integrated with Azure DevOps Server / Services and Visual Studio. Numbered changesets, branches, shelvesets, check-in policies, native linking to work items, fine-grained path permissions. See 03.
Git — Distributed, object model based on snapshots, trivial branching, unmatched ecosystem. See 02.
Rating Grid#
🟡 Practical level
Expert ratings out of /5, context: team of 5 to 30 developers, project mixing code, SQL, and BI, large repository of a few GB, enterprise-hosted repository. These are assessments, not measurements (see RATING).
| Criterion | Git | TFVC | SVN | Perforce | Mercurial | Plastic/Unity VC |
|---|---|---|---|---|---|---|
| Learning curve | 2/5 | 4/5 | 4/5 | 3/5 | 3/5 | 3/5 |
| Performance on large repositories | 3/5 | 4/5 | 3/5 | 5/5 | 3/5 | 4/5 |
| Branches / merges | 5/5 | 3/5 | 2/5 | 3/5 | 4/5 | 4/5 |
| Traceability / audit | 4/5 | 4/5 | 3/5 | 4/5 | 4/5 | 3/5 |
| Permission granularity | 2/5 | 5/5 | 4/5 | 5/5 | 2/5 | 3/5 |
| Binary / large files | 2/5 (LFS: 3/5) | 4/5 | 4/5 | 5/5 | 2/5 | 5/5 |
| CI/CD integration | 5/5 | 3/5 | 3/5 | 3/5 | 2/5 | 2/5 |
| SQL/BI fit | 4/5 | 3/5 | 3/5 | 3/5 | 3/5 | 2/5 |
| Ecosystem longevity | 5/5 | 2/5 | 2/5 | 4/5 | 1/5 | 2/5 |
Key justifications: Git loses on learning (index, rebase, detached HEAD) but wins on everything else in the ecosystem; TFVC is simple and precise for permissions, but its future is constrained (see 03); Perforce dominates massive repositories; Mercurial has a good model but few platforms.
Choosing#
🔴 Expert level
Simplified decision tree:
Decision criteria to define before choosing the tool:
- File size and type: mostly text (SQL, TMDL, JSON) → Git is excellent. Mostly binary files of hundreds of MB → Perforce/Plastic, or Git + LFS with discipline.
- Permission model: need to split folder access for contractors? Git requires separate repositories; TFVC does this natively.
- Skills: who trains juniors? The job market and documentation overwhelmingly favor Git.
- Delivery chain: pipelines, pull-request code reviews, branch policies: Git is the lowest-cost path.
- Support horizon: a VCS at the end of investment carries technical debt risk.
- Migration cost: history to preserve? work item links? labels? permissions?
For a new data/BI project in 2026, Git by default, with a platform that enforces pull requests and builds. For a TFVC project in production, do not migrate “because it's trendy”: migrate when a specific benefit is identified (code reviews, CI, hiring, longevity) and planned (04).
Code assistants (Copilot and equivalents) are trained first on Git and its commands; their help on TFVC (tf.exe) is less reliable. This is an indirect but real selection criterion. Details in 02.
Cross-Cutting Pitfalls#
🔴 Expert level
- ⚠️ Pitfall — Confusing backup and versioning: a VCS is not a backup without replication; back up the server (TFVC collection database, remote repositories).
- ⚠️ Pitfall — Kitchen-sink commits: a commit mixing a fix, reformatting, and a new feature makes auditing and
revertunusable. One commit = one topic. - ⚠️ Pitfall — Data in the repository: large reference tables, exports,
.bakbackups, secrets. See 06. - ⚠️ Pitfall — Long-lived branches: the longer a branch lives, the more merging costs (cost grows faster than time). See 05.
- ⚠️ Pitfall — Non-standardized encoding and line endings: “whole-file” diffs and corrupted accents. See 06.
See Also#
- Git In Depth · TFVC in Depth · Git vs TFVC: compare, migrate, coexist
- Azure DevOps / TFS In Depth
- Matrix: version control and branches
- CI/CD · Glossary
✻ Written by Claude Sonnet 5.5