clement13.net
Original photo: Le phare de Vieste, sur son îlot, vu depuis la plage au bord d'une mer calme.
Description
Le phare de Vieste, sur son îlot, vu depuis la plage au bord d'une mer calme.
Source
Bernard Gagnon · original page
Licence
CC0 Public domain
Original photo, unretouched. The background is a version of it stylised by the site.

About This Site

A personal resource site on critical thinking, organizational maturity, and SQL, written with AI assistance and clearly stated as such.

≈ 2 min readReading
In brief
  • For whom: project managers, managers, developers, and data leads who want to make decisions with fewer biases.
  • AI: assisted writing, always disclosed; sensitive figures include a verification badge.
  • Privacy: no cookies; anonymous traffic measurement, hosted by the site itself; a few preferences stored in your browser.
  • Version: what the current version adds, and the version history.
On this page

What’s new in this version#

Current version: 1.3.1

Esprit critique#

  • Sept liens corrigés dans les sources : deux DOI (Ingham et coll. 1974, Loewenstein, O'Donoghue et Rabin 2003), la page de la Coca-Cola Company sur « New Coke », le communiqué de la CFPB sur Wells Fargo, celui d'Aalto (repris sur le site de HIIT), la page de la Bibliothèque Kennedy sur la baie des Cochons et la page institutionnelle d'Ilana Ritov.

Interface#

  • Page « Santé du site » : le logo à gauche du titre devient un cœur traversé par un électrocardiogramme, lisible à petite taille ; l'animation du moniteur reste dans le panneau de gauche.
  • Page « Santé du site » : les liens externes comptent une quatrième catégorie, « instables » (accès qui varie selon le client : robots refusés, certificat, erreur intermittente). Ils sont listés à part et ne sont comptés ni comme morts ni comme non vérifiables ; les chiffres de la page sont remesurés.
  • Contrôle de 82 pages : les 47 « en attente de relecture » et 35 des 69 « vérifiées en partie ». Statuts, licences, chiffres, dates et références rouverts à la source ; 122 corrections ; 54 pages passent « vérifiées », 28 restent « en partie » avec la liste de ce qui reste à recontrôler. Aucune page ne reste « en attente de relecture ». Les traductions anglaises des pages modifiées sont refaites en première version.

Technique#

  • Contrôle des liens : la page « Santé du site » n'est plus comptée comme source des liens morts qu'elle liste ; un fichier de configuration interne recense les liens instables et la raison.

All versions

Who this site is for#

The site brings together three sets of resources:

  • Critical thinking: cognitive biases that can affect IT project management and team management, with real cases, methods to protect against them, and a measure of their scale.
  • Maturity: matrices to identify where you are and decide where to go, for an organization or for a data product.
  • SQL / T-SQL: thinking in sets rather than rows, with annotated examples and disaster cases.

It is intended for people who lead IT projects, manage teams, or build data products, and who want to make decisions with fewer predictable errors.

What sets this site apart#

  • Each sensitive claim shows its review status: verified, partially verified, or pending, with a list of what still needs to be rechecked when you hover over the badge.
  • Diagrams are readable on hover: each box includes a description, an example, or a pitfall.
  • Its own metrics are published: the Site Health page shows status and progress, version after version, including what still remains to be done.
  • It is built without external dependencies and refuses to degrade silently: how this site is built.

How AI is used#

A large part of the text was written with the help of generative AI, based on an outline and precise instructions, then reviewed and adjusted. This is not hidden: the site states it here and wherever useful (article verification badge, content signature). Author illustrations are program-drawn avatars (no photographs of people are reproduced); background photographs are royalty-free, stylized, with their source available when hovering over the “i” badge.

How content is verified#

Each article includes a verification badge: “verified” (facts, figures, and references checked), “partially verified” (main facts have been checked, with a list of items still to recheck, visible on hover), or “review pending.” Sources are cited at the bottom of each page. Figures reported from memory are marked as such. This badge indicates a review status, not a guarantee: a reference work or the original publication always takes precedence.

Privacy and accessibility#

  • No cookies, no third-party services: chart libraries are hosted on the site. Only anonymous traffic measurement (Umami, cookieless, hosted on the site’s domain) counts page views, including error pages; it does not identify you and is not used for any advertising.
  • The browser stores only your preferences: light or dark theme, open or closed menu, right panel, article reading mode, language, welcome conversation speed, levels entered in matrices. They never leave your computer.
  • The site respects “reduce motion,” supports keyboard navigation, and provides each chart’s data in table form.

Report an error, request a correction#

An inaccurate fact, a figure to correct, a stronger source, a removal request concerning a person or company mentioned: write to us from the Contact page. Cited cases rely on public sources listed in each article, and wording remains cautious (“according to...”) when facts are debated.

Licenses#

Open-source components, photographs, and license texts are detailed on the Licenses and open-source components page.