Normalcy bias

Because nothing serious has ever happened, we conclude that nothing serious will happen, and we do not prepare.

Bias≈ 10 min readCheckedCheck doneFacts, figures and references were checked against the sources cited in the page.Written with AI assistance; sources are cited at the bottom of the page. An error? Report it via clement13.net.Reading
FrequencyOccasionalA few times a year, in typical situations.
Where you meet it
  • Recovery plans
  • Backups
  • Security
  • Operations
  • Hosting
  • Business continuity
  • Crisis management
AI helpGoodA real gain, with safeguards. See how ↓
In brief
  • What: a severe event we have never experienced is treated as impossible, or negligible, and we do not prepare for it.
  • Why: past experience is treated as a guarantee; imagining it is costly, preparing for it costs even more.
  • Detect: “it has never happened,” a recovery plan never exercised, a backup never restored.
  • Avoid: run the exercise for real, restore regularly, imagine failure before it happens, keep backups separate from production.
On this page

Definition#

Normalcy bias (normalcy bias) is the tendency to underestimate the probability and effects of a disaster, and to keep acting as if the usual situation will continue. It is mostly described in studies of disaster response: when an alert occurs, some people do not move, interpret signs as harmless, or wait for confirmation. In 1994, psychologists Haim Omer and Nahman Alon framed it as a “principle of continuity”: when facing an event, people first try to preserve continuity with the known world, rather than accept a rupture.

In IT and management, the feared event is a fire, a total outage, an attack that encrypts everything, the loss of a vendor, the sudden departure of the only person who understands a system. The bias is not about ignoring risks (most teams have a list), but about not treating them as possible: no testing, no budget, no procedure.

A bias more described than measured

Normalcy bias is mainly documented through case studies and post-disaster testimony. Frequently cited figures (“70% of people freeze in danger”) circulate without solid sources: this page uses none of them. It relies on well-documented operations incidents.

The mechanism#

  • The absence of events is treated as proof. Ten years without a major incident says almost nothing about the probability of a rare incident, but creates the feeling of zero risk. It is a form of faulty induction, close to Availability heuristic: what we do not remember does not exist.
  • Imagination has a cost. Picturing a site completely destroyed is unpleasant. It is more comfortable to file the idea under “theoretical” scenarios.
  • Preparation has no visible return. A tested restore produces nothing as long as nothing happens; it competes with tasks that visibly move forward. The cost is certain, the benefit hypothetical.
  • The need for continuity. Faced with an ambiguous warning signal, people first look for the most ordinary explanation (“a false alarm,” “a temporary incident”), which delays response.
  • Dilution of responsibility. The recovery plan belongs “to operations,” backup “to the hosting provider,” security “to the dedicated team”: no one checks the whole picture (see The bystander effect).
No major incidentfor years“This cannothappen here”Few resources forbackups, plans, testingPreparation nevertested, silentlyfailingThe incident happens,the real state is revealedWay out: restore for real,exercise the plan, imagine failure(pre-mortem)if we survivebreaks the belief
Each year without an incident reinforces the belief that there will not be one, which further reduces resources devoted to preparation. The way out is a real test, which replaces belief with observation.Hover over or tap an element to read its details.

Where it appears#

In project management#

  • Backups never restored. The scheduled task runs every night and reports “success”; no one has ever tried to bring a system back online from it.
  • Backups in the same location. Copies, snapshots, and replicas are stored in the same data center, the same rack, the same account as production: they protect against a disk failure, not against fire, hacking, or account deletion.
  • The recovery plan “on paper.” A document approved three years ago, never exercised, with contacts and passwords now changed.
  • The single vendor, the single person. A component, provider, or expert whose failure would stop everything, with no plan B.
  • Alerts classified as noise. A rare or unusual signal is filed with false alarms, because “it is always like this.”
  • The production environment treated like testing. Destructive commands run without safeguards, because “it has always gone fine.”

In management#

  • Continuity budget sacrificed. In cost-cutting periods, what produces no immediate output (exercises, redundancy, documentation) is cut first.
  • Unexpected departure. The team works thanks to one key person; no knowledge transfer is organized, because they have “always been here.”
  • Weak signals ignored. A team saying “we are at the limit” is not believed until an incident confirms it.
  • Improvised crisis management. No one decided in advance who decides, who communicates, who calls the customer: the first hours are lost.

Famous cases#

Famous case

GitLab.com: five backup mechanisms, none reliable January 31 - February 1, 2017#

Biases at play: normalcy bias, trust in backups never tested.

about 300 GBof data accidentally deleted on the primary database
about 6 hoursof data lost (between 5:20 PM and midnight UTC)
about 18 hoursof service unavailability
5 out of 5backup or replication mechanisms that were not working reliably

What happened. On January 31, 2017, a GitLab engineer, while trying to restore PostgreSQL database replication, accidentally deleted the primary database directory. About 300 GB of data had already disappeared when the command was interrupted. While attempting restoration, the team discovered that the backups they relied on were useless: the standard backup failed silently because the tool version did not match the database version, and failure notifications had not reached their destination. According to GitLab's published analysis, none of the five backup or replication mechanisms in place was working reliably; recovery was done from a copy prepared six hours earlier for another purpose. The service remained unavailable for about 18 hours. About 5,000 projects, 5,000 comments, and 700 accounts created during the lost window disappeared; Git repositories and wikis, stored elsewhere, were unaffected. GitLab streamed the recovery live and published a detailed analysis that remains a model of transparency.

Duration (hours)data lost: about 6 hunavailability: about 18 h
Orders of magnitude for durations reported in GitLab's analysis: data lost (between the recovery copy and the incident) and total service unavailability.

What this illustrates

A backup that has never been restored is a hypothesis, not a backup. A nightly task's “success” report proves the task ran, not that data is recoverable. The preventive reflex is a regular restore exercise, with real-time measurement, and an alert that notifies when a backup fails or when it produces nothing.

Famous case

The OVHcloud fire in Strasbourg March 10, 2021#

Biases at play: normalcy bias, underestimation of a physical event, co-located backups.

March 10, 2021, 12:47 AMstart of the fire in the SBG2 center
≈ 3.6 millionwebsites offline, across about 464,000 domain names (Netcraft)
1 center destroyed, 1 partiallySBG2 destroyed, SBG1 partially; SBG3 and SBG4 shut down as a precaution

What happened. During the night of March 9 to 10, 2021, a fire broke out in one of OVHcloud's four data centers in Strasbourg. The SBG2 center was destroyed, SBG1 was partially damaged, and SBG3 and SBG4 were shut down. According to measurements by Netcraft, about 3.6 million websites across 464,000 domain names were unavailable, including public services, online banks, and stores. For some customers, data was lost permanently. Several discovered that their backups or safety copies were at the same site as the machines they were supposed to protect, and lost both. The company, for its part, stated that responsibility for offsite backup belonged to customers depending on the subscribed offer type.

What this illustrates

“Our hosting provider is serious” does not remove the need to ask what remains if the entire site disappears. The useful question is not “is it likely?” but “can we restart?”. A copy that shares the same location, account, or provider as the original is exposed to the same events. Professionals summarize this principle with the so-called “3-2-1” rule: three copies, on two media types, with one offsite.

Detection signals#

  • “That has never happened” or “that cannot happen here” in a risk discussion.
  • The recovery plan has not been exercised in the last twelve months, or ever under real conditions.
  • No one can state the date of the last successful restore or how long it took.
  • Backups are with the same provider, at the same site, or under the same credentials as production.
  • “Extreme” risks are classified as “unlikely” without estimation and without measuring their impact if they occur.
  • Alerts are routine: people have stopped reading them.

Avoidance reflexes#

  1. Actually restore. At fixed intervals, rebuild an environment using only backups, measure the time, and note what is missing. That's the only proof a backup is useful.
  2. Separate copies from production. A different site, a different account, a different provider, or at least a different failure domain. An immutable or offline copy also protects against an attack.
  3. Run a pre-mortem. “Let's imagine that next year everything has been down for three days: what happened?” The exercise brings out scenarios we refuse to think about.
  4. Quantify in impact, not probability. For a rare event, the question is “how much time, how much data, how much money?” If the answer is “the company stops,” the risk is addressed even if it is unlikely.
  5. Practice the plan, including the human side. Who decides, who alerts customers, who has access? A crisis drill announced in advance, then a surprise drill.
  6. Monitor the absence of signal. A backup that produces nothing, an alert that never triggers: treat silence as an anomaly to verify.
  7. Make the result visible. A “last validated restore” date displayed on the operations dashboard, with a named owner.

With AI: detect, fix, mitigate#

Estimated AI help: fairly good

AI is useful for imagining scenarios a team suppresses and for reviewing a recovery plan without complacency. It tests nothing: it replaces neither a real restore nor a drill. It can also seem falsely reassuring by describing a “complete” plan on paper.

Detect#

  • Review a recovery plan and identify what has never been verified or tested.
  • Spot in a described architecture the single points of failure and co-located copies.
  • Search reports for wording like “this has never happened.”

Fix#

  • Produce a list of extreme scenarios specific to the described system, with their effects.
  • Write a restore drill scenario, with success criteria.
  • Propose backup separation measures (site, account, medium).

Mitigate#

  • Use AI for a written pre-mortem, then discuss it as a team.
  • Have it play the adversary looking for how to destroy everything in one shot.
  • Have its proposals validated by those who know operations: it ignores your context.

Prompts to integrate into your workflows#

1. Pre-mortem of a major incident. To use in a risk committee or when preparing a recovery plan.

Here is a system architecture (anonymized description): [components, hosting, backups, access, dependencies].
Imagine that in twelve months this system has been completely unavailable for three days and data has been lost.
Propose six plausible and very different causes (physical, human, malicious, provider, organizational, technical).
For each one: what was missing to prevent it, what would have allowed faster recovery, and the concrete check to perform right now.
Do not reassure: point out what is not described in my text.

2. Critical review of a recovery plan. To use on an existing continuity or recovery plan.

Review this recovery plan like a skeptical auditor.
1. List, for each step, what has probably never been tested.
2. Identify backup copies that share a common point with the original (site, account, provider, credentials).
3. Indicate forgotten dependencies (access, keys, contacts, licenses).
4. Propose a two-hour restore drill, with what must be measured.
5. Say in one sentence what seems most fragile to you.

Plan: [plan text, without passwords or confidential data]

How to integrate them#

  • Before the annual drill: prompt 1 prepares more varied scenarios than those the team chooses spontaneously.
  • During the plan review: prompt 2 produces the list of checks to perform, which is turned into scheduled tasks.
  • After the drill: compare what AI predicted with what the drill revealed, to improve future scenarios.

Precautions#

  • AI proves nothing: only a real restore validates a backup.
  • Never paste credentials, addressing plans, or security diagrams into an unauthorized tool.
  • Verify the commands and technical references it proposes before using them on a real system.
  • A “complete” plan written by AI has no value until it has been practiced.

Limits#

  • Normalcy bias is more described than measured: statistics on disaster response are fragile, and some researchers believe crowd behavior in crises is less passive than is often said.
  • Not preparing for everything is sometimes reasonable: you cannot protect against every scenario, and preparation has a cost. The bias begins when the decision is not made consciously, by comparing costs and effects.
  • The hindsight bias points the other way: after the fact, the incident seems “obvious” (see Hindsight bias). Avoid harshly judging yesterday's decision with today's information.
  • In the two incidents cited, attributing it to normalcy bias is an interpretation: published analyses describe technical and organizational failures, not people's mindset.

Sources and verification#

See also#

Combines with, or reinforces#

These biases feed each other.

Variants or cousins: not to be confused.

What neutralises it.

  • The pre-mortem
  • Les exercices de reprise (restauration testée) (concept or method, no page)
  • L'ingénierie du chaos (concept or method, no page)