Pro-innovation bias

What is new is presumed better, and those who hesitate to adopt it are presumed behind.

Bias≈ 9 min readPartly checkedPartial checkThe main facts were checked by searching the cited sources. The items below still need checking before relying on them.To re-check
  • Chiffres de ventes du Segway (objectifs 50 000-100 000, environ 6 000 fin 2003) issus de presse et Wikipedia, non d'une source primaire.
  • Ryan et Gross (1943) : dates et effectif exacts de l'étude non relus dans l'article original.
Written with AI assistance; sources are cited at the bottom of the page. An error? Report it via clement13.net.
Reading
FrequencyFrequentSeveral times per project.
Where you meet it
  • Technology choice
  • Monitoring
  • Architecture
  • Digital transformation
  • Management tools
  • Change management
AI helpGoodA real gain, with safeguards. See how ↓
In brief
  • What: we assume an innovation is good, that everyone should adopt it, quickly, and without changes.
  • Why: a progress narrative, the prestige of the new, and we mostly hear from successes and promoters.
  • Detect: arguments like “everyone is doing it,” claimed benefits without measurement, holdouts treated as backward.
  • Avoid: compare against the current state using criteria, require evidence, test at small scale, plan the exit.
On this page

Definition#

Avatar of Everett RogersFictitious illustration
Everett RogersAmerican1931 – 2004Communication sociologist, author of Diffusion of Innovations (1962)

The pro-innovation bias is the presumption that an innovation is beneficial in itself, that it should be adopted by all stakeholders, that it should spread quickly, and that it should neither be modified nor rejected. The term is analyzed by sociologist Everett Rogers, whose book Diffusion of Innovations (1962) is the reference on how new ideas spread; he critiques it in later editions.

Rogers notes that diffusion research studied almost only innovations that succeeded, and treated those who did not adopt them as laggards. But rejecting, abandoning, or modifying an innovation can be perfectly rational. So this bias is not simply a taste for novelty, but an asymmetry in the burden of proof: the old must justify its place, while the new is presumed to deserve it.

The mechanism#

  • The progress narrative. We spontaneously associate the new with improvement. Promoters of an innovation are enthusiastic and numerous; its critics are quieter, creating an impression of unanimity.
  • Survivorship bias. Innovations that succeeded are visible and taught; those that failed disappear from memory (see Survivorship bias).
  • The “modern” identity. Adopting early is valued; hesitation is seen as rigidity. This social pressure aligns with the The Bandwagon Effect (Trend Effect).
  • The gap between promise and use. The announced benefits are demo benefits; integration, training, migration, and maintenance costs only appear after adoption.
  • Interests. Vendors, consultants, and teams driving change have an interest in adoption, and their voice dominates the available information.
An innovationappears, promotedby its advocatesFavorablepresumption(“it's progress”)The current state mustjustify itself,not the newBroad and fastadoption,without testing or exitCosts and limitsdiscoveredafter the factCountermeasuressame criteria forold and newsmall-scale trialexit planbeforeduring
The innovation enters the discussion with a favorable presumption; the current state must defend itself. Countermeasures put both on the same criteria grid before adoption.Hover over or tap an element to read its details.

Where you encounter it#

In project management#

  • Technology choice: a recent framework, language, or database is preferred over ones that work, based on articles and conferences rather than measured needs.
  • Architecture: moving to a trendy architecture (microservices, events, “serverless”) when the problem does not call for it, with a team that does not master it.
  • Technology monitoring: monitoring reports only what is new, never feedback from those who abandoned it.
  • Migration: replacing a suitable tool with a newer one, while underestimating transition costs and loss of know-how.
  • Adopting an AI assistant or tool: organization-wide launch without a value-measurement phase, because “everyone is getting into it.”

In management#

  • Organizational transformation: a trendy organizational or methodological model is rolled out as self-evident, and reservations are read as resistance to change.
  • Judging people: employees who hesitate in front of a new tool are judged on attitude rather than on their reasons, which may be very sound.
  • Reporting: innovation gains are announced by those who championed it, without independent measurement.
  • Recruitment and communication: highlighting the modernity of the tech stack as an attractiveness argument, rather than the content of the work.

Famous cases#

Famous case

Segway, “bigger than the Internet” 2001-2020#

Biases at play: pro-innovation bias, adoption optimism.

décembre 2001public unveiling of the Segway
50 000 à 100 000expected first-year sales, depending on source
~6 000units sold by late 2003 (approx.)
~140 000units sold over twenty years

What happened. Unveiled in December 2001 by inventor Dean Kamen, the Segway, a self-balancing personal transporter, was announced with exceptional enthusiasm. Well-known investors predicted a product that would transform cities; accounts mention targets of tens of thousands of units in the first year (from 50,000 to 100,000 depending on source), and even a comparison to the Internet (investor John Doerr). By late 2003, only about 6,000 units had been sold. After about twenty years of production, the Segway PT was discontinued in 2020, with around 140,000 units sold, mainly to tour operators and security services.

Units (thousands)top target: about 100sold by late 2003: about 6
Top-end first-year target and cumulative sales by late 2003, in thousands of units (orders of magnitude reported by the press; targets vary from 50 to 100 depending on source; unofficial).

What this illustrates

Outstanding technology is not the same as an adopted product: usage is missing (where can it be ridden? at what price? under what regulations?). Promoter enthusiasm is not a measure of demand. Before committing resources, ask who will gain what, and what happens if there are ten times fewer users than expected.

Famous case

Google Glass: from enthusiasm to withdrawal 2012-2015#

Biases at play: pro-innovation bias, presumption of adoption.

2012public presentation of the project
1 500 $price of the “Explorer” edition (2013)
janvier 2015end of sales for the “Explorer” edition

What happened. Introduced in 2012, Google Glass connected glasses were released to an early-adopter audience in 2013 at a price of $1,500. They generated both excitement in specialized media and rejection: privacy concerns, appearance, and poorly defined usefulness. In January 2015, Google stopped selling the “Explorer” edition and later refocused the project on professional uses.

What this illustrates

Those who rejected the product were not “laggards”: they were expressing real objections (privacy, social use). Treating resistance as information rather than delay is precisely the correction Rogers proposed.

Reference study

Hybrid corn in Iowa, a foundational diffusion study 1943#

Bias at play: case study biased toward innovations that succeeded.

One of the studies behind the field is Bryce Ryan and Neal Gross’s (1943) work on adoption of hybrid corn by Iowa farmers. The innovation was genuinely beneficial, and adoption took about a decade to move from a few pioneers (the variety left trial phases around 1927) to near-universal use. Rogers saw in it the model of an “S” diffusion curve, and later noted that the field had been built on this type of case—obvious successes—without studying rejected or abandoned innovations.

What this illustrates

Even an excellent innovation still spreads slowly: slow adoption is not proof of irrational resistance. And a research field, like a company monitoring function, that studies only successes will mechanically produce pro-innovation bias.

Detection signals#

  • “Everyone is doing it,” “it's the future,” “we can't stay on the sidelines.”
  • The file details the benefits of the novelty and stays vague about costs, risks, and exit.
  • Critics are labeled as “resistant to change” without examining their arguments.
  • The comparison is not against the improved current solution, but against its version from ten years ago.
  • Evidence comes from the vendor, conferences, or promotional articles.
  • Adoption is planned everywhere all at once, with no trial phase.

Avoidance reflexes#

  1. Compare against the current state using criteria, not image. What specific problem are we solving? What does the current situation cost, measured? What additional value does the innovation bring, quantified?
  2. Apply the same evidence standard to both sides. If we ask the old to justify its place, we ask the new as well.
  3. Look for failures. For each innovation under consideration, find who abandoned it and why; seek critical feedback, not just testimonials.
  4. Try small, measure, then decide. A bounded pilot with indicators chosen beforehand is better than a broad rollout.
  5. Plan the exit. Reversibility, exit cost, vendor dependency: plan B is a decision criterion.
  6. Listen to holdouts. Their objections are free information; ask them what would need to be true for them to adopt.
  7. Accept modification and rejection. Adapting the innovation to context, adopting it partially, or rejecting it are legitimate outcomes, not failures.

With AI: detect, remediate, mitigate#

Estimated AI help: partial

AI helps structure the comparison and look for counterarguments. But it is itself the product of a narrative very favorable to novelty, tends to favor recent technologies, and may cite nonexistent feedback. Its opinion on adopting AI itself should be treated with particular caution.

Detect#

  • Identify, in a proposal, unquantified benefits and missing costs.
  • Flag appeals to authority and trendiness (“everyone,” “market standard”).
  • List the implicit assumptions in an adoption argument.

Fix#

  • Produce a comparison grid between the current solution (improved) and the innovation, with weighted criteria.
  • Write the counterargument: the best reasons not to adopt right now.
  • Propose a pilot plan with indicators and stop criteria.

Mitigate#

  • Run a premortem: “in one year, the adoption failed; why?”
  • Have people list what would need to be observed to change their minds.
  • Require sources for every claim, then verify them yourself.

Prompts to integrate into your practices#

1. Premortem of an adoption. Before deciding to adopt a new technology or method.

We are considering adopting [technology / method / tool] for [goal]. Imagine that, in one year, this adoption has failed.
Give the ten most plausible causes of failure, ranked by likelihood, distinguishing: technical, organizational, economic, human.
For each cause, propose an observable early signal and a risk-reduction measure.
Do not invent specific cases or statistics; if you cite an experience, say whether it is verifiable.

Context: [team, current setup, constraints]

2. The current solution versus novelty. To compare using the same criteria.

Compare, on an identical criteria grid, our current solution (improved with reasonable effort) and [innovation]: [list of criteria we defined beforehand].
For each criterion, indicate what is known, what is assumed, and what would need to be measured to decide.
End with: (1) the conditions under which it would be reasonable to stay with the current solution; (2) the conditions under which to adopt; (3) the least costly test that would allow a decision.

How to integrate them#

  • Before the decision: prompt 2 provides the grid, which the team revises; prompt 1 serves as a final safeguard.
  • During the pilot: the premortem’s early signals become tracked indicators.
  • At review: compare measured results with the initial assumptions, including when the outcome is disappointing.

Precautions#

  • AI can invent feedback, tools, or numbers: every reference must be verified.
  • Do not share confidential data from your organization or vendors in an unauthorized tool.
  • The generated grid uses common criteria: add your own (regulation, hosting, skills, exit cost).

Limitations#

  • Pro-innovation bias is described mainly by work in the sociology of diffusion, rather than established by controlled experiments like other biases; it overlaps with trend effects, optimism, and social pressure.
  • The opposite exists and is no more reasonable: the status quo bias and rejection of what comes from outside (see the The “Not Invented Here” syndrome) cause good innovations to be missed. The point is not to distrust the new, but to judge it using the same criteria.
  • The Segway numbers are orders of magnitude reported by the press and books; they vary by source.

Sources and verification#

  • Rogers, E. M. (1962), Diffusion of Innovations, Free Press; 3rd edition (1983) for the discussion of pro-innovation bias; 5th edition (2003).
  • Ryan, B. & Gross, N. (1943), “The diffusion of hybrid seed corn in two Iowa communities,” Rural Sociology, 8(1).
  • Kemper, S. (2003), Code Name Ginger: The Story Behind Segway and Dean Kamen's Quest to Invent a New World, Harvard Business School Press.
  • The New Atlantis, “America at 10 mph” — retrospective on Segway and its forecasts.