

- Description
- Rayonnages de bibliothèque garnis de livres, avec quelques ouvrages présentés sur le dessus.
- Source
- Mshuang2 · original page
- Licence
- CC0 Public domain
Bibliography and Resources
A selective list of references this section is based on, grouped by theme, with what each one contributes and the file in this section it relates to.
In brief
- A selective list of references this section is based on, grouped by theme, with what each one contributes and the file in this section it relates to.
- No web links are provided: addresses change and I cannot verify them all; search for the exact title. Publication dates are only mentioned when they are certain; otherwise, “current edition to be verified.”
- References are cited by name; always consult the latest version of a standard or online documentation (as of 2026-10).
Level: 🟢→🔴
Project management and methods#
| Reference | Type | What it contributes | In this section |
|---|---|---|---|
| The Scrum Guide (2020 edition, by Ken Schwaber and Jeff Sutherland) | Official guide, short | Reference definition of Scrum: roles, events, artifacts, commitments; check whether a more recent edition exists (as of 2026-10) | Scrum, the framework (Scrum Guide 2020), Scrum in Practice |
| The Manifesto for Agile Software Development (2001) and its twelve principles | Foundational text | The four values and twelve principles of agility | Agile and Lean Methods (Manifesto, Kanban, XP, Lean, Shape Up, DSDM, SAFe, DevOps…) |
| A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute | Framework | Project management vocabulary and processes; eighth edition published by PMI in November 2025, current edition to be verified | Predictive Methods (waterfall, V-model, spiral, RUP, PMBOK, PRINCE2, Merise, CMMI) |
| PRINCE2 (AXELOS / PeopleCert) | Method | Stage-based governance, roles, and continuous business justification; current edition to be verified | Predictive Methods (waterfall, V-model, spiral, RUP, PMBOK, PRINCE2, Merise, CMMI) |
| Kanban — Kanban: Successful Evolutionary Change for Your Technology Business, David J. Anderson | Book | Kanban as a change method: visualize, limit work in progress, manage flow | Agile and Lean Methods (Manifesto, Kanban, XP, Lean, Shape Up, DSDM, SAFe, DevOps…) |
| The Principles of Product Development Flow, Donald G. Reinertsen | Book | Queue economics, batch size, cost of delay: theoretical foundation of flow | Project Management Fundamentals |
| The Mythical Man-Month, Frederick P. Brooks Jr. | Classic book | Why adding people to a late project makes it later; limits of estimation | Project Management Fundamentals |
| Peopleware, Tom DeMarco and Timothy Lister | Classic book | The human factor, work environment, team productivity | PI Matrix — team |
| Team Topologies, Matthew Skelton and Manuel Pais | Book | Team organization around flow, cognitive load, interaction modes | Choosing Your Method and Hybridizing |
Continuous delivery, DevOps, and measurement#
| Reference | Type | What it contributes | In this section |
|---|---|---|---|
| Accelerate, Nicole Forsgren, Jez Humble, and Gene Kim | Book, research-based | The four delivery metrics (deployment frequency, lead time for changes, change failure rate, time to restore service) and their links to performance | CI/CD: Continuous Integration and Continuous Delivery, Maturity Matrix — Software Development (code DL) |
| DORA reports (State of DevOps, DevOps Research and Assessment) | Annual reports | Evolution of practices and performance classes; exact values change, consult the most recent edition | DL Matrix — CI/CD |
| Continuous Delivery, Jez Humble and David Farley | Book | Deployment pipeline, automated tests, reliable deployment | CI/CD: Continuous Integration and Continuous Delivery |
| The Phoenix Project and The DevOps Handbook (Gene Kim and co-authors) | Novel and handbook | The “three ways”: flow, feedback, continuous learning | CI/CD for data: foundations, datamarts, pipelines, and reports |
| Site Reliability Engineering (Google, O'Reilly editions) | Book | Service level objectives (SLOs), error budget, incident management | DL Matrix — observability |
| Refactoring (Martin Fowler) and Clean Code (Robert C. Martin) | Books | Safe rewriting techniques, code readability | DL Matrix — code quality |
| Working Effectively with Legacy Code (Michael C. Feathers) | Book | Introducing tests into existing code without breaking it | DL Matrix — technical debt |
Tools: version control and tracking#
| Reference | Type | What it contributes | In this section |
|---|---|---|---|
| Pro Git, Scott Chacon and Ben Straub | Book, freely available online | The reference for understanding Git in depth: object model, branches, merges, history | Git In Depth |
| Official Git documentation | Documentation | Command manual pages; version to consult depends on the installation | Git In Depth |
| Microsoft Learn documentation — Azure DevOps (Azure DevOps Services and Azure DevOps Server) | Documentation | Repositories (TFVC and Git), boards, pipelines, work item tracking; features must be rechecked based on the deployed version (as of 2026-10) | Azure DevOps Server (formerly TFS) In Depth, TFVC In Depth |
| Microsoft Learn documentation — Team Foundation Version Control | Documentation | tf commands, workspaces, branches, TFVC merges |
TFVC In Depth |
| Jira documentation (Atlassian) | Documentation | Projects, workflows, boards, integration; to be checked according to edition | Jira In Depth and Alternatives |
| Trunk Based Development (community reference site) | Resource | Trunk-based development, short branches, feature flags | Branching Strategies |
Data: modeling, governance, lifecycle#
| Reference | Type | What it contributes | In this section |
|---|---|---|---|
| The Data Warehouse Toolkit, Ralph Kimball and Margy Ross | Book | The reference for dimensional modeling: star schema, conformed dimensions, facts, slowly changing dimensions | BI Matrix — semantic model, PD Matrix — modeling |
| The Data Warehouse Lifecycle Toolkit, Ralph Kimball and co-authors | Book | Data warehouse lifecycle: requirements, architecture, development, deployment | Methods Specific to Data Projects |
| Building the Data Warehouse, W. H. Inmon | Book | Normalized enterprise data warehouse approach, compared with the dimensional approach | Methods Specific to Data Projects |
| Data Vault (Dan Linstedt) | Method | Modeling with hubs, links, and satellites, suited to historization and integration of multiple sources | PD Matrix — modeling |
| DAMA-DMBOK (Data Management Body of Knowledge, DAMA International) | Framework | Data management framework: governance, quality, metadata, security; current edition to be verified (a 2nd edition exists) | PD Matrix |
| CRISP-DM 1.0 (Cross-Industry Standard Process for Data Mining, 2000) | Process guide | Six-phase cycle for data mining projects: business understanding, data understanding, preparation, modeling, evaluation, deployment | Methods Specific to Data Projects |
| General Data Protection Regulation (GDPR) | Regulatory text | European legal framework for personal data; to be read in the official version, with guidance from the data protection officer | PD Matrix — security and compliance |
| Data Management at Scale, Piethein Strengholt, and Data Mesh, Zhamak Dehghani | Books | Large-scale data architecture; domain-owned data products | PD Matrix — governance |
Power BI, Fabric, and SQL Server#
| Reference | Type | What it provides | In section |
|---|---|---|---|
| Microsoft Learn documentation — Power BI | Official documentation | Semantic models, DAX, RLS, deployment, capacities, administration; everything changes frequently, check the page date (status 2026-10) | Cross-Cutting Power BI Good Practices |
| Microsoft Learn documentation — Microsoft Fabric (OneLake, lakehouse, warehouse, Direct Lake, mirroring) | Official documentation | Fabric architecture; several features change status (preview, general availability): verify again before making a decision | OneLake + SaaS mobile apps: overview, Comparison — OneLake / Fabric vs Managed SQL Server for Power BI Reporting |
| Microsoft Learn documentation — Azure SQL Database, Azure SQL Managed Instance, and SQL Server | Official documentation | Service tiers, high availability, security, compatibility | SQL Server in SaaS — Overview |
| Microsoft Learn documentation — Power BI Project (PBIP) and TMDL format | Official documentation | Text-based project format, model and report versioning | BI Matrix — industrialization |
| SQLBI (Marco Russo and Alberto Ferrari) | Reference site, books, and training | DAX, modeling, optimization; The Definitive Guide to DAX is the reference book; DAX Studio and Tabular Editor are common tools in the ecosystem | BI Matrix — DAX |
| Guy in a Cube (video channel), Power BI community | Community resources | Feedback and lessons learned on Power BI and Fabric; cross-check with official documentation | Cross-Cutting Power BI Good Practices |
| Microsoft Learn documentation — Power BI: capacity planning and Capacity Metrics | Official documentation | Capacity consumption tracking and sizing | BI Matrix — operations |
| SQL Server — Query Performance Tuning, Grant Fritchey | Book | Execution plans, statistics, T-SQL query optimization (edition to verify) | BI Matrix — performance |
Maturity and measurement#
| Reference | Type | What it provides | In section |
|---|---|---|---|
| CMMI (Capability Maturity Model Integration, CMMI Institute) | Maturity model | History of five-level maturity models; this Academy draws inspiration from it without reproducing it | Maturity Matrices — Principle, Anatomy, and Comparison |
| Goodhart’s Law (common wording: “when a measure becomes a target, it ceases to be a good measure”) | Principle | Foundation for safeguards against misuse of indicators | Self-Assessment with Maturity Matrices |
| How to Measure Anything, Douglas W. Hubbard | Book | Measuring what seems intangible; uncertainty and the value of information | Project Metrics and Reporting |
| Thinking, Fast and Slow, Daniel Kahneman | Book | Cognitive biases in estimation and judgment, useful for understanding calibration | Self-Assessment with Maturity Matrices — calibration |
AI: responsible use#
| Reference | Type | What it provides | In section |
|---|---|---|---|
| European regulation on artificial intelligence (“AI Act”) | Regulatory text | European legal framework by risk level; phased implementation timeline, verify at the source (status 2026-10) | Cross-Functional Summary — AI Contribution |
| NIST AI Risk Management Framework | Framework | Managing AI-related risks: govern, map, measure, manage | Cross-Functional Summary — AI Contribution |
| OWASP — Top 10 for applications based on large language models | Resource | Risks specific to generative AI applications (prompt injection, information disclosure); the list is updated, check the version | Cross-Functional Summary — AI Contribution |
| Assistant vendor documentation (terms of service, data policy) | Documentation | Data retention, use for training, location: to be reviewed for each selected tool | Cross-Functional Summary — AI Contribution — confidentiality |
How to use this list#
- Beginner: Pro Git (if Git), The Scrum Guide (if Scrum), Microsoft Learn Power BI documentation for the fundamentals.
- Practitioner: Accelerate, The Data Warehouse Toolkit, SQLBI for DAX, Azure DevOps documentation for TFVC and pipelines.
- Expert: DAMA-DMBOK, Site Reliability Engineering, Team Topologies, regulatory texts (GDPR, AI regulation) with support from legal.
Date your reviews. For any online documentation (Microsoft Learn, Atlassian, AI vendors), note the reading date in your notes: content evolves, and this is the only way to explain later why a decision was made.
Symptom: a rule applied by the team no longer matches current documentation (performance class, service level, license). Cause: a value read in an old book or report was frozen in place. Remedy: for any threshold or feature name, verify the most recent source before writing it into a policy.
An assistant can help find and summarize references, but it sometimes invents plausible titles, authors, dates, or links. Verify each reference in a reliable source (publisher catalog, official website) before citing it.
See also#
- Framework: RATING · Glossary · Reading Paths.
- Matrices: principle and comparison · self-assessment.
- Summary: AI Contribution.
- Sections: Project Management: Methods, CI/CD, and AI · Tools: Version Control Systems, Planning, and Oversight · Power BI Reporting — OneLake and Managed SQL Server.
✻ Written by Claude Sonnet 5.5